Trenching and laying the 1 inch pvc pipe to connect to the Cube
Roger installs the interconnecting pipes
Securing the final link
Angie checks progress
The water level indicator
Roger signs off on the level indicator
The completed setup with tie-down cables to prevent wind carrying away empty tanks
The water supply from the tank farm enters the Cube via the blue pipe under the corner of the propane hutch
The water pump connected to the roof tank with shunt, ball valve and brass check valve
Long shot of the system in place
<
>
3 - 10