Framing plan for North wall of shed. Note the sliding door hung from a rail
Framing plan of West wall of shed. Hand-drawn notations show the correct way to frame a corner
Framing the South wall. Temporary braces hold the structiure upright
The East wall frame is added
Framing for three walls in place
John about to add a junction box to connect the electrical feed from the panels. The sliding door panel has not yet been mounted
Ben adding finishing touches to the eaves
Eight solar panels in place
Finished shed with slats added to the insect screen vent on the North wall—view from the first floor of the incomplete Cube with the original water tank structure
The shed becomes the power source for the remaining construction
<
>