The North porch in its original state
Deterioration wood and inadequate support beams
Many of the 1 x 4 slats were warped
After the old structure was dismantled new supporting posts and beams were installed
Metal tie plates secure the beams to the wall
The beginnings of an access ladder
2 x 4 slats were installed leaving a a gap
The hatch set aside to allow access
The hatch in closed position and with a recessed handle added
The East view from the sleeping platform
Final detail on the inside of the triangular truss
Two dowels provide a hand grip to help climbing onto the platform
The ladder ties in with the rows of cedar boards on the building exterior
Dan heads for the beach after working hard on the porch
<
>
14 - 14