The Cube site before construction seen from the wash
This small concrete slab with the ruins of brick walls was on the site when we acquired it
The slab, now clear of debris will become the foundation for the shed
Stakes marking the edge of a new concrete slab that would extend to the East and South of the original slab. A crew of local was to pour and finish the job. The rocks in the foreground will be incuded in the concrete
The completed slab extension with the limber delivered and stockpiled, ready to build the Cube
The orginal slab now doubled in size
The footprint of the Cube marked out on the extended slab
Power tools are being run off a generator beacuse there is no photovoltaic system installed yet. First the shed must be built
Laying the mudsills for the shed
<
>
2 - 9